πŸšΆπŸ½β€β™‚οΈ

🏁 what I’m considering SOMA, Rincon Hill, and South Beach loosely and not accurately bound by 16th Street, Market Street the Embarcadero, and Mission Creek.

I don’t get to SOMA very often, and when I do it’s from Muni or a BART or whatever so it was mentally just a bunch of islands.

Lots and lots of half-block alleys to dead ends, and in fact I left the dead ends of Welsh St. from Fifth and Morris unwalked. Oh well.

Next: starting on the north side of market.

https://mastodon.social/@gravely/114529945329729737

a map of san francisco’s east side with the fefrry building in the top right corner and market at castro in the bottom left corner. Every street and alley south of market (the bottom right half of the map) has a purple line on it indicating that I’ve walked it with GPS on. A few paths are also marke on the other side - from my work to various events and up to coit tower, but not much.
Figure 2. a map of san francisco’s east side with the fefrry building in the top right corner and market at castro in the bottom left corner. Every street and alley south of market (the bottom right half of the map) has a purple line on it indicating that I’ve walked it with GPS on. A few paths are also marke on the other side - from my work to various events and up to coit tower, but not much.
Proximate posts in the Mastodon collection
Newer Mastodon post from September 7, 2025, 115164897766075900 07 September 2025
Mastodon post from September 1, 2025, 115131006752136270 01 September 2025
This post Mastodon post from September 1, 2025, 115130986580534108 01 September 2025
Older Mastodon post from September 1, 2025, 115130153229481577 01 September 2025
Mastodon post from August 31, 2025, 115125763984062187 31 August 2025
Proximate posts in the General collection
Newer Morning Walk 02 September 2025
Mastodon post from September 1, 2025, 115131006752136270 01 September 2025
This post Mastodon post from September 1, 2025, 115130986580534108 01 September 2025
Older Lunch Walk 01 September 2025
Mastodon post from September 1, 2025, 115130153229481577 01 September 2025

Pizza Slow (high quality)

Β© 2026 gravely